With the 1/2 worn weight post needing replacing I sent a second distributor to David to be used for parts. It is an R10 Ducellier unit which is basically the same however with a shorter shaft length. One of the good posts from the spares distributor is removed and will be tig welded into the Gordini distributor.
| Gordini Distributor shaft on left and parts shaft on right showing the posts are the same size. |
| Drilling out the new post. |
| Post removed. |
| Removing the worn post in the Gordini shaft. |
| Replacement post. |
| Replacement post ready to be tig welded in position. |
No comments:
Post a Comment