Thursday, October 20, 2016

Distributor rebuild update.

With the 1/2 worn weight post needing replacing I sent a second distributor to David to be used for parts. It is an R10 Ducellier unit which is basically the same however with a shorter shaft length. One of the good posts from the spares distributor is removed and will be tig welded into the Gordini distributor.
Gordini Distributor shaft on left and parts shaft on right
showing the posts are the same size.

Drilling out the new post.

Post removed.

Removing the worn post in the Gordini shaft.

Replacement post.

Replacement post ready to be tig welded in position.

No comments:

Post a Comment